You are here: Home > Bench options > Power strips > Installed in frame
 

 

 
 
Plugs Installed in Bench Frame  
 
   
Installed in frame
 
 
     

Outlets are installed in the front or back of the bench frame.
Please specify front or back location. Select number of outlets below. 10' cord included. UL listed parts.

Lighted Switch and Circuit Breaker Included.

 
 
4 Plugs Installed-In-Frame Power Strips  
   
 
Description Model Weight
Installed in back, facing back X4BB
Installed in back, facing forward X4BF 4
Installed in front, facing back X4FB 4
stalled in front, facing forward X4FF 4
 
  Lead Time: Green 1-3 Days, Orange 3-5 Days, Black 5-10 Days.
Large & custom orders take slightly longer.
 
     
 
8 Plugs Installed-In-Frame Power Strips  
   
 
Description Model Weight
Installed in back, facing back X8BB 6
Installed in back, facing forward X8BF 6
Installed in front, facing back X8FB 6
Installed in front, facing forward X8FF 6
 
  Lead Time: Green 1-3 Days, Orange 3-5 Days, Black 5-10 Days.
Large & custom orders take slightly longer.
 
     
All content Copyright © 2009. All rights reserved.